Concrete Estimating Services: What’s Included, Cost and How to Choose

Concrete estimating services from Build Plans And Estimates give general contractors, concrete subcontractors and developers an accurate concrete takeoff, full material, labor and equipment pricing, and a bid-ready Excel and PDF estimate. Send your plans and we confirm the scope before any work begins.

Serving the USA, Canada, UK and Australia  |  Measured in Bluebeam and PlanSwift  |  Second-review quality check

What are concrete estimating services?

Concrete estimating services measure every concrete element on your plans, then price the concrete, formwork, rebar, finishing, pumping and labor so you can bid with confidence. A specialist team delivers a concrete takeoff plus a bid-ready estimate, so contractors can price Division 3 scope without hiring in-house estimators.

Concrete work sits in CSI MasterFormat Division 03. It covers cast-in-place concrete, precast concrete, formwork, reinforcing steel, finishing, curing and concrete repairs. A good concrete estimator reads the architectural, structural and civil sheets together, because slab thicknesses, footing sizes and mix requirements are often spread across all three.

Concrete takeoff vs concrete estimate

A concrete takeoff is the list of quantities: cubic yards, square feet of formwork, pounds of rebar. A concrete estimate prices those quantities with material, labor, equipment and markup. Read more in our guides to quantity takeoff services and construction takeoff services, or see our main concrete estimating service page.

What we estimate: concrete scope

Our concrete takeoff services cover foundations, footings, slabs, blocks, pavers, driveways, garages, basements and parking lots, plus the supporting items that drive most of the cost. Here is what we measure and what moves the price.

Concrete elementWhat we measureWhat drives cost
Slabs on gradeArea, thickness, joints, vapor barrier, finishThickness, finish type, joint layout
Footings and foundationsContinuous and spread footings, stem walls, padsDepth, soil conditions, formwork
Walls and retaining wallsWall length, height, thickness, both-face formworkHeight, form reuse, bracing
Columns and beamsSections, heights, lengths, rebar cagesSection size, rebar density
Elevated slabs and decksSlab area, drop panels, shoring, post-tensioningShoring height, crane or pump access
Curbs, sidewalks and pavingLinear feet, area, base prep, jointsFinish, subgrade, volume of small pours
Tilt-up and precastPanels, embeds, lifting, erectionPanel size, crane time, freight
Shotcrete and repairsSurface area, thickness, prep, reinforcementAccess, rebound allowance, prep

Supporting items we price with every pour

ItemWhat we measureWhat drives cost
FormworkContact area (SFCA), reuse, stripping, bracingForm type, reuse count, labor
ReinforcementRebar by size and weight, wire mesh, laps, chairsBar size, spacing, lap length
Anchors, dowels and embedsAnchor bolts, dowels, plates, sleevesCount, size, placement tolerance
Pumping, finishing and curingPump setup, finishing method, curing compound, jointsAccess, finish quality, weather

Reinforcement is a large share of many concrete bids, so we link it to our dedicated rebar estimating services.

What you receive

Every concrete cost estimating package is built to drop straight into your bid. No black boxes: you can see where each number comes from.

Takeoff spreadsheet

Quantities by element and location, ready to filter and edit.

Material, labor and equipment

A full breakdown for every line, so each number can be checked.

Marked-up plans

Every quantity traced back to the drawing it came from.

Assumptions and exclusions

Listed clearly, so nothing is hidden in the fine print.

Revisions for addenda

Updated numbers when plans change before bid day.

Excel and PDF files

Ready to send, edit or drop into your own bid form.

Send your concrete plans, get a bid-ready estimate

Share drawings, specs and your bid date. We confirm the scope before any work begins.

Get a Free Quote

How our concrete estimating process works

Six steps from plans to a bid-ready number. The second review is the part most estimating firms skip, and it is where we catch missed scope.

  1. Send your plans

    Share drawings, specifications, project location and bid date through our contact page.

  2. Scope review

    We check the concrete scope against the specs and confirm inclusions, exclusions and price with you before work starts.

  3. Takeoff

    Our estimators measure every element in Bluebeam and PlanSwift, with quantities marked up on your plans.

  4. Pricing

    Quantities are priced with regional material, labor and equipment rates, including local ready-mix, pumping and finishing.

  5. Second review

    A second estimator checks quantities, thicknesses, waste factors and addenda before anything leaves our desk.

  6. Delivery

    You receive the Excel and PDF estimate with marked-up plans, assumptions and exclusions.

How concrete quantities are calculated

This is the core of any concrete quantity takeoff. Use the calculator, then open each tab to see the same method on a real 40 × 28 ft building. Every number is shown so you can check it.

Volume (CY) = L × W × T ÷ 27
  • L length, ft
  • W width, ft
  • T thickness, ft (inches ÷ 12)
  • 27 cu ft per cubic yard

Try it with your own dimensions

Enter a slab, pad or footing. Results update as you type.

  1. 6 in ÷ 12 = 0.5 ft
  2. 40 × 28 × 0.5 = 560 cu ft
  3. 560 ÷ 27 = 20.74 CY
  4. 20.74 × 1.1 = 22.81 CY
Suggested order23 CY
Net concreteWaste allowance
Net volume
20.74 CY
With waste
22.81 CY
Metric, net
15.86 m³
Truckloads at 10 CY
≈ 3

Worked examples

Slab on grade: 40 × 28 ft, 6 in thick

  1. Thickness in feet: 6 in ÷ 120.5 ft
  2. Volume: 40 × 28 × 0.5560 cu ft
  3. Cubic yards: 560 ÷ 2720.74 CY
  4. Add 10% waste: 20.74 × 1.1022.81 CY
  5. Order, rounded up23 CY

Metric check: 20.74 CY × 0.7646 = 15.86 m³ before waste.

Concrete estimating services calculation diagram: 40 ft by 28 ft by 6 in slab on grade Isometric slab showing length 40 feet, width 28 feet and thickness 6 inches, which equals 20.74 cubic yards before waste. Length: 40 ft Width: 28 ft Thickness: 6 in (0.5 ft) 40 × 28 × 0.5 ÷ 27 = 20.74 CY

Footing and foundation wall

  1. Perimeter: 2 × (40 + 28)136 LF
  2. Footing: 136 × 2 × 1 ÷ 2710.07 CY
  3. Footing plus 5% waste10.6 CY
  4. Wall: 136 × 4 × 0.667 ÷ 2713.43 CY
  5. Wall plus 5% waste14.1 CY
  6. Footing and wall combined24.7 CY
Concrete estimating services formwork diagram: footing and foundation wall cross-section Cross-section of a 2 ft by 1 ft footing under an 8 in thick, 4 ft high wall, with forms on both faces. Schematic, not to scale. Wall: 8 in × 4 ft Footing: 2 ft × 1 ft Form contact area (SFCA)

Formwork in square feet of contact area

  1. Wall, both faces: 136 × 4 × 21,088 SFCA
  2. Footing, both sides: 136 × 1 × 2272 SFCA
  3. Total contact area1,360 SFCA
  4. If forms are reused 3 times: 1,360 ÷ 3≈ 453 SF

Reuse counts are illustrative. We set the real reuse factor from the form system, the number of pours and the labor to strip and reset.

Concrete estimating services formwork diagram: footing and foundation wall cross-section Cross-section of a 2 ft by 1 ft footing under an 8 in thick, 4 ft high wall, with forms on both faces. Schematic, not to scale. Wall: 8 in × 4 ft Footing: 2 ft × 1 ft Form contact area (SFCA)

Rebar: #4 bars at 12 in. each way

  1. Bars along 40 ft: 29 × 401,160 LF
  2. Bars along 28 ft: 41 × 281,148 LF
  3. Total length2,308 LF
  4. Weight: 2,308 × 0.668 lb per LF1,542 lb
  5. Add 10% for laps and waste1,696 lb
Bar size#3#4#5#6
Weight, lb per LF0.3760.6681.0431.502
Concrete estimating services rebar diagram: #4 bars at 12 inches on centre each way Plan view of a 40 ft by 28 ft slab with a grid of #4 reinforcing bars, 29 bars in one direction and 41 in the other. Schematic, not to scale. 29 bars × 40 ft (orange) 41 bars × 28 ft (navy) #4 @ 12 in. each way

Waste allowances we start from

ElementTypical waste starting pointWhy
Slab on grade5% to 10%Uneven subgrade, spillage, edge variation
Footings and walls3% to 5%Trench over-dig, form deflection
Rebar5% to 10%Laps, hooks, cut-off waste
Small or irregular pours10% or morePump priming and truck minimums

These are common starting points, not fixed rules. We set allowances from the drawings, site access and your own history.

Why it matters: a missed waste factor or a wrong thickness changes the order by whole truckloads. For reinforcement-heavy jobs, see our rebar estimating page, and for site pours see sitework estimating.

Concrete estimating cost factors

No two concrete jobs price the same. These are the ten factors that move a concrete cost estimate the most.

Cost factorHow it changes the estimate
Mix design and PSIHigher-strength mixes and special additives cost more per cubic yard.
Local ready-mix pricesPlant prices, delivery zones and short-load fees vary by region.
Formwork typeCustom or curved forms cost far more than standard reusable forms.
Rebar densityHeavier bars and tighter spacing raise both material and placing labor.
Pump or crane accessPoor truck access means pumping, which adds setup and hourly cost.
Labor ratesLocal wages and union rules change placing and finishing costs.
Weather and seasonCold-weather protection or hot-weather curing adds cost.
Site accessTight sites slow deliveries and add handling time.
Finish typeBroom, trowel, stamped or polished finishes each have different labor.
Project sizeLarge pours spread fixed costs, while small pours carry higher unit prices.

Still at design stage? Our cost estimating, budget estimating and preliminary estimate services price concrete before drawings are final.

Need a concrete takeoff before your bid date?

Tell us your deadline when you send the plans. We confirm the timeline with the scope.

Get a Free Quote

Concrete estimating by project type

Residential

Foundations, basements, garage slabs, driveways and patios for homes and multi-family. See residential estimating.

Commercial

Footings, elevated decks, columns, shear walls and parking structures. See commercial estimating.

Industrial

Heavy slabs, equipment pads, tilt-up and containment. See industrial estimating.

Civil and site concrete

Curbs, gutters, sidewalks, paving and retaining walls. See sitework estimating.

Related trades: masonry, structural steel, rebar and thermal and moisture protection. Browse all of our trades.

Why outsource concrete estimating?

To outsource concrete estimating is to bid more jobs without adding payroll. Contractors typically gain a higher bid volume, no software cost, fewer missed scope items and fewer overbids and underbids.

FactorIn-house estimatorBuild Plans And Estimates
CostSalary, benefits and software licensesPay per project, no fixed overhead
SpeedLimited by one estimator's workloadCapacity to handle bid peaks
SoftwareYou buy and maintain takeoff toolsTakeoff tools already in place
AccuracyOne person checks their own workSecond review before delivery
ScalabilityHiring takes monthsScale up or down by project

Common concrete estimating mistakes

These six errors cause most overbids and underbids. Our second review checks for each one.

Missed waste factor

Ordering the exact net volume leaves you short once spillage, over-excavation and an uneven subgrade are counted.

Ignored formwork reuse

Pricing every form as single-use inflates the bid. Counting too many reuses underprices it.

Missing rebar laps

Bars rarely run full length. Laps, hooks and chairs add real weight.

Wrong thickness from the specs

Plans and specs sometimes disagree. Always check both.

Forgetting pump and finishing

Pump setup, finishing and curing are easy to leave out of a quick bid.

Unchecked addenda

A revised sheet can change a slab thickness overnight.

Software and tools we use

Our estimators measure plans in Bluebeam and PlanSwift, price with industry databases such as RSMeans, and deliver results in Excel. We can also match your cost codes or bid form, so the numbers drop straight into your own bid sheet. See our full list of tools on the services page.

BluebeamPlanSwiftRSMeansTrimbleExcelPDF markups

Sample estimate: a real ADU bid, line by line

Here is an excerpt from an actual Build Plans & Estimates workbook: a 980 SF ADU in North Hollywood, CA with 282 priced line items across 14 CSI divisions. Every line carries quantity, waste, material, labor and a final unit cost, so you can see exactly where each dollar goes.

Project4181–4183 Tujunga AveLocationNorth Hollywood, CA 91604Sample workbook
Direct cost$284,839All 14 divisions
Line items282Quantified from plans
Cost per SF$378Based on 980 SF
Total bid$370,291With OH, profit & contingency

Where the money goes

Direct cost by CSI division. Wood framing and finishes together make up about 40% of the subtotal.

09Finishes
$58,93420.7%
06Wood, Plastics & Composites
$56,38119.8%
26Electrical
$25,7709.0%
22Plumbing
$23,1858.1%
08Openings
$29,22410.3%
07Thermal & Moisture Protection
$19,6726.9%
05Metals
$17,6746.2%
03Concrete
$14,2195.0%
23HVAC
$11,1033.9%
11Equipment
$8,9233.1%
02Demolition
$6,7642.4%
10Specialties
$5,8732.1%
12Furnishings
$4,7441.7%
31Earthwork
$2,3720.8%

Inside the workbook

Pick a trade to see real line items. Quantities include the waste factor shown in the workbook (5% on most concrete and sheathing).

ItemQty incl. wasteUnitMaterialLaborTotal
Continuous footing1′-4″ × 1′-0″ with (2) #5 rebar6.8CY$2,497$2,268$4,765
Pad footing2′-0″ × 2′-0″ × 2′-0″ with #4 rebar each way1.6CY$568$516$1,083
Stem wall8″ thick, 2′-4″ high with #4 at 16″ o.c.8.0CY$2,931$2,662$5,593
Concrete stair3′-0″ wide with #4 top & bottom0.7CY$267$242$509
Stair landing2′-0″ thick with #4 top & bottom2.3CY$838$761$1,600
Division 03 total (incl. vapor barrier, sand, gravel, dowels)$14,219
ItemQty incl. wasteUnitMaterialLaborTotal
2″×12″×12′ floor joist19EA$513$757$1,270
2″×6″×14′ rafter28EA$608$1,124$1,732
4″×6″×8′ post26EA$971$942$1,913
3.5″×9.25″×18′ ridge beam2.2E engineered lumber1EA$329$149$478
¾″ structural plywood @ floor36 sheets (4′×8′), 5% waste1,192.8SF$1,563$1,715$3,278
15/32″ structural plywood @ roof26 sheets (4′×8′), 5% waste868.5SF$973$1,249$2,222
Division 06 total (beams, posts, joists, rafters, sheathing, wall framing, cabinets)$56,381
ItemQtyUnitMaterialLaborTotal
2″ sanitary pipe (ABS)91.7LF$1,078$1,781$2,859
Electric water heater2EA$1,440$1,329$2,769
Mini-split indoor unit2EA$2,438$1,095$3,533
Mini-split condensing unit2EA$3,270$1,468$4,738
20A/1P breaker24EA$616$1,284$1,900
150A sub-panel2EA$1,452$1,065$2,517
Plumbing $23,185 · HVAC $11,103 · Electrical $25,770$60,058

How to read each line

Quantity & waste

Takeoff quantity from the plans, plus a waste factor (0–15%) to get the order quantity.

Material

Unit price times quantity. Owner-supplied items show $0 so nothing is double-counted.

Labor

Productivity-based hours multiplied by a trade rate ($30–$60 per hour in this sample).

Unit cost

Total divided by base quantity, which makes it easy to compare against past bids.

From direct cost to total bid

Direct cost subtotal$284,839
Overhead (10%)$28,484
Profit (15%)$42,726
Insurance (0%)$0
Contingency (5%)$14,242
Total bid cost$370,291

Sample figures only. Prices, labor rates and markups reflect one project and one market, and the workbook is fully editable in Excel.

Want this level of detail on your own project? Send us your plans and we will return a complete, editable estimate with quantities, waste, labor and markups.

Sample Estimate

Pricing and turnaround

We quote per project, not per hour, so your cost is known before work starts. The fee depends on plan size, the number of concrete elements, drawing quality and your deadline. You pay 50% to begin and 50% when the estimate is complete. See details on our pricing page.

Turnaround depends on the size and complexity of your set. We confirm the timeline together with the scope. We do not publish win-rate or average-price claims we cannot back up, so you only see what we can prove in your own estimate.

Get a Free Quote

How to choose a concrete estimating company

Use this checklist before you hand over your plans:

  • Division 3 experience: ask what concrete scope they have estimated before
  • Sample work: ask to see a real estimate, not a brochure
  • Software: look for named takeoff tools and Excel output
  • Revision policy: confirm how addenda are handled
  • Turnaround: get a timeline in writing before work starts
  • Communication: make sure you can reach the estimator who built your numbers

Learn more about us or browse our construction estimating services.

Where we work

We provide concrete estimating services in the USA, Canada, the UK and Australia, and adapt units, currency and measurement standards to your country. Concrete is measured in cubic yards in the US and cubic metres elsewhere.

CountryCurrencyUnitsFormat
United StatesUSDImperial (cubic yards)CSI MasterFormat
CanadaCADMetric or imperialCSI MasterFormat
United KingdomGBPMetric (cubic metres)NRM1 and NRM2
AustraliaAUDMetric (cubic metres)ACMM-aligned

Concrete estimating services FAQs

What do concrete estimating services include?

Concrete estimating services include a full concrete takeoff, pricing for concrete, formwork, rebar, finishing, pumping and labor, and a bid-ready Excel and PDF estimate. We measure from your plans and specifications, list assumptions and exclusions, and mark up the drawings so every quantity can be traced and checked.

How much do concrete estimating services cost?

We price each project individually, not by the hour. The fee depends on plan size, the number of concrete elements, drawing quality and your bid deadline. Send your plans and we confirm the scope and price before work starts, with 50% due to begin and 50% when the estimate is complete.

How long does a concrete takeoff take?

Turnaround depends on the size and complexity of the drawings and how many concrete elements they show. Small projects can be quick, while large commercial sets take longer. We confirm the timeline together with the scope, so you can plan around your bid deadline.

Do you include rebar and formwork?

Yes. We measure formwork by contact area (SFCA) and reinforcing steel by bar size, length and weight, plus wire mesh, dowels, anchors and accessories. If you need a detailed bar-by-bar scope, our rebar estimating team can take that on as a separate service.

Can you estimate from PDF plans?

Yes. Most takeoffs start from PDF drawings, which we measure in Bluebeam and PlanSwift. Send the architectural and structural sheets together with the specifications so we can read slab thicknesses, footing sizes and mix requirements. If the plans are incomplete, we flag the gaps instead of guessing.

Do you handle addenda and revisions?

Yes. Send any addendum or revised sheet before your bid date. We compare it with the original set, update the affected quantities and re-issue the estimate with the changes noted. We confirm how revisions are handled when we agree the scope, so there are no surprises.

What is the difference between a concrete takeoff and an estimate?

A concrete takeoff lists quantities only, such as cubic yards of concrete, square feet of formwork and pounds of rebar. A concrete estimate takes those quantities and adds material, labor, equipment and markup pricing. A takeoff lets you price with your own rates; an estimate gives you the full bid number.

Do you serve small concrete subcontractors?

Yes. We work with general contractors, developers and small concrete subcontractors. Pricing is per project, so a subcontractor bidding a few jobs each month pays only for the estimates it orders, without buying takeoff software or hiring a full-time estimator.

Which software do you use?

We measure quantities in Bluebeam and PlanSwift, price with industry databases such as RSMeans and regional rates, and deliver the results in Excel. Where possible, we match your cost codes or bid form so the numbers drop straight into your own bid sheet.

What file formats do you deliver?

You receive an editable Excel workbook with the takeoff and pricing, plus a PDF of the estimate and the marked-up plans. Need a different layout? We follow your cost codes or bid form where possible, and report in cubic yards or cubic metres to suit your country.

Free quote

Get your concrete estimate from Build Plans And Estimates

Send your plans and project location. We confirm the scope and price before any work begins, then deliver a bid-ready concrete takeoff and estimate.

Ready when you are

Tell us about your project and we will reply with a quote.

Get a Free Quote View concrete service page info@buildplansandestimates.com
  • Takeoff checked by a second estimator
  • Excel and PDF with marked-up plans
  • USA, Canada, UK and Australia