Concrete Estimating Services: What’s Included, Cost and How to Choose
Concrete estimating services from Build Plans And Estimates give general contractors, concrete subcontractors and developers an accurate concrete takeoff, full material, labor and equipment pricing, and a bid-ready Excel and PDF estimate. Send your plans and we confirm the scope before any work begins.
Serving the USA, Canada, UK and Australia | Measured in Bluebeam and PlanSwift | Second-review quality check
What are concrete estimating services?
Concrete estimating services measure every concrete element on your plans, then price the concrete, formwork, rebar, finishing, pumping and labor so you can bid with confidence. A specialist team delivers a concrete takeoff plus a bid-ready estimate, so contractors can price Division 3 scope without hiring in-house estimators.
Concrete work sits in CSI MasterFormat Division 03. It covers cast-in-place concrete, precast concrete, formwork, reinforcing steel, finishing, curing and concrete repairs. A good concrete estimator reads the architectural, structural and civil sheets together, because slab thicknesses, footing sizes and mix requirements are often spread across all three.
Concrete takeoff vs concrete estimate
A concrete takeoff is the list of quantities: cubic yards, square feet of formwork, pounds of rebar. A concrete estimate prices those quantities with material, labor, equipment and markup. Read more in our guides to quantity takeoff services and construction takeoff services, or see our main concrete estimating service page.
What we estimate: concrete scope
Our concrete takeoff services cover foundations, footings, slabs, blocks, pavers, driveways, garages, basements and parking lots, plus the supporting items that drive most of the cost. Here is what we measure and what moves the price.
| Concrete element | What we measure | What drives cost |
|---|---|---|
| Slabs on grade | Area, thickness, joints, vapor barrier, finish | Thickness, finish type, joint layout |
| Footings and foundations | Continuous and spread footings, stem walls, pads | Depth, soil conditions, formwork |
| Walls and retaining walls | Wall length, height, thickness, both-face formwork | Height, form reuse, bracing |
| Columns and beams | Sections, heights, lengths, rebar cages | Section size, rebar density |
| Elevated slabs and decks | Slab area, drop panels, shoring, post-tensioning | Shoring height, crane or pump access |
| Curbs, sidewalks and paving | Linear feet, area, base prep, joints | Finish, subgrade, volume of small pours |
| Tilt-up and precast | Panels, embeds, lifting, erection | Panel size, crane time, freight |
| Shotcrete and repairs | Surface area, thickness, prep, reinforcement | Access, rebound allowance, prep |
Supporting items we price with every pour
| Item | What we measure | What drives cost |
|---|---|---|
| Formwork | Contact area (SFCA), reuse, stripping, bracing | Form type, reuse count, labor |
| Reinforcement | Rebar by size and weight, wire mesh, laps, chairs | Bar size, spacing, lap length |
| Anchors, dowels and embeds | Anchor bolts, dowels, plates, sleeves | Count, size, placement tolerance |
| Pumping, finishing and curing | Pump setup, finishing method, curing compound, joints | Access, finish quality, weather |
Reinforcement is a large share of many concrete bids, so we link it to our dedicated rebar estimating services.
What you receive
Every concrete cost estimating package is built to drop straight into your bid. No black boxes: you can see where each number comes from.
Takeoff spreadsheet
Quantities by element and location, ready to filter and edit.
Material, labor and equipment
A full breakdown for every line, so each number can be checked.
Marked-up plans
Every quantity traced back to the drawing it came from.
Assumptions and exclusions
Listed clearly, so nothing is hidden in the fine print.
Revisions for addenda
Updated numbers when plans change before bid day.
Excel and PDF files
Ready to send, edit or drop into your own bid form.
Send your concrete plans, get a bid-ready estimate
Share drawings, specs and your bid date. We confirm the scope before any work begins.
How our concrete estimating process works
Six steps from plans to a bid-ready number. The second review is the part most estimating firms skip, and it is where we catch missed scope.
Send your plans
Share drawings, specifications, project location and bid date through our contact page.
Scope review
We check the concrete scope against the specs and confirm inclusions, exclusions and price with you before work starts.
Takeoff
Our estimators measure every element in Bluebeam and PlanSwift, with quantities marked up on your plans.
Pricing
Quantities are priced with regional material, labor and equipment rates, including local ready-mix, pumping and finishing.
Second review
A second estimator checks quantities, thicknesses, waste factors and addenda before anything leaves our desk.
Delivery
You receive the Excel and PDF estimate with marked-up plans, assumptions and exclusions.
How concrete quantities are calculated
This is the core of any concrete quantity takeoff. Use the calculator, then open each tab to see the same method on a real 40 × 28 ft building. Every number is shown so you can check it.
- L length, ft
- W width, ft
- T thickness, ft (inches ÷ 12)
- 27 cu ft per cubic yard
Try it with your own dimensions
Enter a slab, pad or footing. Results update as you type.
- 6 in ÷ 12 = 0.5 ft
- 40 × 28 × 0.5 = 560 cu ft
- 560 ÷ 27 = 20.74 CY
- 20.74 × 1.1 = 22.81 CY
- Net volume
- 20.74 CY
- With waste
- 22.81 CY
- Metric, net
- 15.86 m³
- Truckloads at 10 CY
- ≈ 3
Worked examples
Slab on grade: 40 × 28 ft, 6 in thick
- Thickness in feet: 6 in ÷ 120.5 ft
- Volume: 40 × 28 × 0.5560 cu ft
- Cubic yards: 560 ÷ 2720.74 CY
- Add 10% waste: 20.74 × 1.1022.81 CY
- Order, rounded up23 CY
Metric check: 20.74 CY × 0.7646 = 15.86 m³ before waste.
Footing and foundation wall
- Perimeter: 2 × (40 + 28)136 LF
- Footing: 136 × 2 × 1 ÷ 2710.07 CY
- Footing plus 5% waste10.6 CY
- Wall: 136 × 4 × 0.667 ÷ 2713.43 CY
- Wall plus 5% waste14.1 CY
- Footing and wall combined24.7 CY
Formwork in square feet of contact area
- Wall, both faces: 136 × 4 × 21,088 SFCA
- Footing, both sides: 136 × 1 × 2272 SFCA
- Total contact area1,360 SFCA
- If forms are reused 3 times: 1,360 ÷ 3≈ 453 SF
Reuse counts are illustrative. We set the real reuse factor from the form system, the number of pours and the labor to strip and reset.
Rebar: #4 bars at 12 in. each way
- Bars along 40 ft: 29 × 401,160 LF
- Bars along 28 ft: 41 × 281,148 LF
- Total length2,308 LF
- Weight: 2,308 × 0.668 lb per LF1,542 lb
- Add 10% for laps and waste1,696 lb
| Bar size | #3 | #4 | #5 | #6 |
|---|---|---|---|---|
| Weight, lb per LF | 0.376 | 0.668 | 1.043 | 1.502 |
Waste allowances we start from
| Element | Typical waste starting point | Why |
|---|---|---|
| Slab on grade | 5% to 10% | Uneven subgrade, spillage, edge variation |
| Footings and walls | 3% to 5% | Trench over-dig, form deflection |
| Rebar | 5% to 10% | Laps, hooks, cut-off waste |
| Small or irregular pours | 10% or more | Pump priming and truck minimums |
These are common starting points, not fixed rules. We set allowances from the drawings, site access and your own history.
Why it matters: a missed waste factor or a wrong thickness changes the order by whole truckloads. For reinforcement-heavy jobs, see our rebar estimating page, and for site pours see sitework estimating.
Concrete estimating cost factors
No two concrete jobs price the same. These are the ten factors that move a concrete cost estimate the most.
| Cost factor | How it changes the estimate |
|---|---|
| Mix design and PSI | Higher-strength mixes and special additives cost more per cubic yard. |
| Local ready-mix prices | Plant prices, delivery zones and short-load fees vary by region. |
| Formwork type | Custom or curved forms cost far more than standard reusable forms. |
| Rebar density | Heavier bars and tighter spacing raise both material and placing labor. |
| Pump or crane access | Poor truck access means pumping, which adds setup and hourly cost. |
| Labor rates | Local wages and union rules change placing and finishing costs. |
| Weather and season | Cold-weather protection or hot-weather curing adds cost. |
| Site access | Tight sites slow deliveries and add handling time. |
| Finish type | Broom, trowel, stamped or polished finishes each have different labor. |
| Project size | Large pours spread fixed costs, while small pours carry higher unit prices. |
Still at design stage? Our cost estimating, budget estimating and preliminary estimate services price concrete before drawings are final.
Need a concrete takeoff before your bid date?
Tell us your deadline when you send the plans. We confirm the timeline with the scope.
Concrete estimating by project type
Residential
Foundations, basements, garage slabs, driveways and patios for homes and multi-family. See residential estimating.
Commercial
Footings, elevated decks, columns, shear walls and parking structures. See commercial estimating.
Industrial
Heavy slabs, equipment pads, tilt-up and containment. See industrial estimating.
Civil and site concrete
Curbs, gutters, sidewalks, paving and retaining walls. See sitework estimating.
Related trades: masonry, structural steel, rebar and thermal and moisture protection. Browse all of our trades.
Why outsource concrete estimating?
To outsource concrete estimating is to bid more jobs without adding payroll. Contractors typically gain a higher bid volume, no software cost, fewer missed scope items and fewer overbids and underbids.
| Factor | In-house estimator | Build Plans And Estimates |
|---|---|---|
| Cost | Salary, benefits and software licenses | Pay per project, no fixed overhead |
| Speed | Limited by one estimator's workload | Capacity to handle bid peaks |
| Software | You buy and maintain takeoff tools | Takeoff tools already in place |
| Accuracy | One person checks their own work | Second review before delivery |
| Scalability | Hiring takes months | Scale up or down by project |
Common concrete estimating mistakes
These six errors cause most overbids and underbids. Our second review checks for each one.
Missed waste factor
Ordering the exact net volume leaves you short once spillage, over-excavation and an uneven subgrade are counted.
Ignored formwork reuse
Pricing every form as single-use inflates the bid. Counting too many reuses underprices it.
Missing rebar laps
Bars rarely run full length. Laps, hooks and chairs add real weight.
Wrong thickness from the specs
Plans and specs sometimes disagree. Always check both.
Forgetting pump and finishing
Pump setup, finishing and curing are easy to leave out of a quick bid.
Unchecked addenda
A revised sheet can change a slab thickness overnight.
Software and tools we use
Our estimators measure plans in Bluebeam and PlanSwift, price with industry databases such as RSMeans, and deliver results in Excel. We can also match your cost codes or bid form, so the numbers drop straight into your own bid sheet. See our full list of tools on the services page.
Sample estimate: a real ADU bid, line by line
Here is an excerpt from an actual Build Plans & Estimates workbook: a 980 SF ADU in North Hollywood, CA with 282 priced line items across 14 CSI divisions. Every line carries quantity, waste, material, labor and a final unit cost, so you can see exactly where each dollar goes.
Where the money goes
Direct cost by CSI division. Wood framing and finishes together make up about 40% of the subtotal.
Inside the workbook
Pick a trade to see real line items. Quantities include the waste factor shown in the workbook (5% on most concrete and sheathing).
| Item | Qty incl. waste | Unit | Material | Labor | Total |
|---|---|---|---|---|---|
| Continuous footing1′-4″ × 1′-0″ with (2) #5 rebar | 6.8 | CY | $2,497 | $2,268 | $4,765 |
| Pad footing2′-0″ × 2′-0″ × 2′-0″ with #4 rebar each way | 1.6 | CY | $568 | $516 | $1,083 |
| Stem wall8″ thick, 2′-4″ high with #4 at 16″ o.c. | 8.0 | CY | $2,931 | $2,662 | $5,593 |
| Concrete stair3′-0″ wide with #4 top & bottom | 0.7 | CY | $267 | $242 | $509 |
| Stair landing2′-0″ thick with #4 top & bottom | 2.3 | CY | $838 | $761 | $1,600 |
| Division 03 total (incl. vapor barrier, sand, gravel, dowels) | $14,219 |
| Item | Qty incl. waste | Unit | Material | Labor | Total |
|---|---|---|---|---|---|
| 2″×12″×12′ floor joist | 19 | EA | $513 | $757 | $1,270 |
| 2″×6″×14′ rafter | 28 | EA | $608 | $1,124 | $1,732 |
| 4″×6″×8′ post | 26 | EA | $971 | $942 | $1,913 |
| 3.5″×9.25″×18′ ridge beam2.2E engineered lumber | 1 | EA | $329 | $149 | $478 |
| ¾″ structural plywood @ floor36 sheets (4′×8′), 5% waste | 1,192.8 | SF | $1,563 | $1,715 | $3,278 |
| 15/32″ structural plywood @ roof26 sheets (4′×8′), 5% waste | 868.5 | SF | $973 | $1,249 | $2,222 |
| Division 06 total (beams, posts, joists, rafters, sheathing, wall framing, cabinets) | $56,381 |
| Item | Qty | Unit | Material | Labor | Total |
|---|---|---|---|---|---|
| 2″ sanitary pipe (ABS) | 91.7 | LF | $1,078 | $1,781 | $2,859 |
| Electric water heater | 2 | EA | $1,440 | $1,329 | $2,769 |
| Mini-split indoor unit | 2 | EA | $2,438 | $1,095 | $3,533 |
| Mini-split condensing unit | 2 | EA | $3,270 | $1,468 | $4,738 |
| 20A/1P breaker | 24 | EA | $616 | $1,284 | $1,900 |
| 150A sub-panel | 2 | EA | $1,452 | $1,065 | $2,517 |
| Plumbing $23,185 · HVAC $11,103 · Electrical $25,770 | $60,058 |
How to read each line
Quantity & waste
Takeoff quantity from the plans, plus a waste factor (0–15%) to get the order quantity.
Material
Unit price times quantity. Owner-supplied items show $0 so nothing is double-counted.
Labor
Productivity-based hours multiplied by a trade rate ($30–$60 per hour in this sample).
Unit cost
Total divided by base quantity, which makes it easy to compare against past bids.
From direct cost to total bid
Sample figures only. Prices, labor rates and markups reflect one project and one market, and the workbook is fully editable in Excel.
Want this level of detail on your own project? Send us your plans and we will return a complete, editable estimate with quantities, waste, labor and markups.
Sample EstimatePricing and turnaround
We quote per project, not per hour, so your cost is known before work starts. The fee depends on plan size, the number of concrete elements, drawing quality and your deadline. You pay 50% to begin and 50% when the estimate is complete. See details on our pricing page.
Turnaround depends on the size and complexity of your set. We confirm the timeline together with the scope. We do not publish win-rate or average-price claims we cannot back up, so you only see what we can prove in your own estimate.
How to choose a concrete estimating company
Use this checklist before you hand over your plans:
- Division 3 experience: ask what concrete scope they have estimated before
- Sample work: ask to see a real estimate, not a brochure
- Software: look for named takeoff tools and Excel output
- Revision policy: confirm how addenda are handled
- Turnaround: get a timeline in writing before work starts
- Communication: make sure you can reach the estimator who built your numbers
Learn more about us or browse our construction estimating services.
Where we work
We provide concrete estimating services in the USA, Canada, the UK and Australia, and adapt units, currency and measurement standards to your country. Concrete is measured in cubic yards in the US and cubic metres elsewhere.
| Country | Currency | Units | Format |
|---|---|---|---|
| United States | USD | Imperial (cubic yards) | CSI MasterFormat |
| Canada | CAD | Metric or imperial | CSI MasterFormat |
| United Kingdom | GBP | Metric (cubic metres) | NRM1 and NRM2 |
| Australia | AUD | Metric (cubic metres) | ACMM-aligned |
Concrete estimating services FAQs
What do concrete estimating services include?
Concrete estimating services include a full concrete takeoff, pricing for concrete, formwork, rebar, finishing, pumping and labor, and a bid-ready Excel and PDF estimate. We measure from your plans and specifications, list assumptions and exclusions, and mark up the drawings so every quantity can be traced and checked.
How much do concrete estimating services cost?
We price each project individually, not by the hour. The fee depends on plan size, the number of concrete elements, drawing quality and your bid deadline. Send your plans and we confirm the scope and price before work starts, with 50% due to begin and 50% when the estimate is complete.
How long does a concrete takeoff take?
Turnaround depends on the size and complexity of the drawings and how many concrete elements they show. Small projects can be quick, while large commercial sets take longer. We confirm the timeline together with the scope, so you can plan around your bid deadline.
Do you include rebar and formwork?
Yes. We measure formwork by contact area (SFCA) and reinforcing steel by bar size, length and weight, plus wire mesh, dowels, anchors and accessories. If you need a detailed bar-by-bar scope, our rebar estimating team can take that on as a separate service.
Can you estimate from PDF plans?
Yes. Most takeoffs start from PDF drawings, which we measure in Bluebeam and PlanSwift. Send the architectural and structural sheets together with the specifications so we can read slab thicknesses, footing sizes and mix requirements. If the plans are incomplete, we flag the gaps instead of guessing.
Do you handle addenda and revisions?
Yes. Send any addendum or revised sheet before your bid date. We compare it with the original set, update the affected quantities and re-issue the estimate with the changes noted. We confirm how revisions are handled when we agree the scope, so there are no surprises.
What is the difference between a concrete takeoff and an estimate?
A concrete takeoff lists quantities only, such as cubic yards of concrete, square feet of formwork and pounds of rebar. A concrete estimate takes those quantities and adds material, labor, equipment and markup pricing. A takeoff lets you price with your own rates; an estimate gives you the full bid number.
Do you serve small concrete subcontractors?
Yes. We work with general contractors, developers and small concrete subcontractors. Pricing is per project, so a subcontractor bidding a few jobs each month pays only for the estimates it orders, without buying takeoff software or hiring a full-time estimator.
Which software do you use?
We measure quantities in Bluebeam and PlanSwift, price with industry databases such as RSMeans and regional rates, and deliver the results in Excel. Where possible, we match your cost codes or bid form so the numbers drop straight into your own bid sheet.
What file formats do you deliver?
You receive an editable Excel workbook with the takeoff and pricing, plus a PDF of the estimate and the marked-up plans. Need a different layout? We follow your cost codes or bid form where possible, and report in cubic yards or cubic metres to suit your country.
Get your concrete estimate from Build Plans And Estimates
Send your plans and project location. We confirm the scope and price before any work begins, then deliver a bid-ready concrete takeoff and estimate.
Ready when you are
Tell us about your project and we will reply with a quote.
Get a Free Quote View concrete service page info@buildplansandestimates.com- Takeoff checked by a second estimator
- Excel and PDF with marked-up plans
- USA, Canada, UK and Australia
Explore more: Services Our Trades Pricing Construction Takeoff